The clarification is in the elimination of all kinds of particulates, sediments, oils and organic matter in the water.

The clarification is in the elimination of all kinds of particulates, sediments, oils and organic matter in the water.

Features:

350 RPM, Heavy Helicacl Gear; Grease Lube.

350 RPM, Heavy Helical Gear, Grease Lube.
Features:

350 RPM, Heavy Helical Gear, Grease Lube
TOP quality, attractively priced, fully assembled RO systems.
Five models for flow rates to 10,800 GPD. Select the features you want to meet your requirements!
Standard features (package #1):
Additional features included with package #2:

Standard features

Four models for flow rates up to 100 GPM.
Additional features included R48 systems:

Three models and two design options for flow rates up to 30 GPM.
Additional features included with system
| N° | Package | GPM | Pump (HP) | Recovery (Adj) | Membrane size | Membrane Array | Feed Water (GPM) |
Typical Rejection | Dimension | Ship Weght (lbs) |
| R44-16-11110 | 1 | 20 |
10/TEFC |
65% – 75% |
4″ x 40″ |
2:2 | 31 |
98% |
192″ x 26″ x 72″ | 1400 |
| R44-16-11110 | 1 | 20 | 2:2 | 31 | 192″ x 26″ x 72″ | 1400 | ||||
| R44-16-11110 | 1 | 20 | 2:2 | 31 | 192″ x 26″ x 72″ | 1400 | ||||
| R44-16-11110 | 1 | 20 | 2:2 | 31 | 192″ x 26″ x 72″ | 1400 | ||||
| R44-16-11110 | 1 | 20 | 2:2 | 31 | 192″ x 26″ x 72″ | 1400 | ||||
| R44-16-11110 | 1 | 20 | 2:2 | 31 | 192″ x 26″ x 72″ | 1400 |
This batch unit will precipitate heavy metals and is good for metal finishing facilities, as well as any application that needs to adjust pH to settle out contaminants such as:


|
Batch Type Model: BT |
Tank Size(Gal.) |
Actual Capacity (Gal) |
Tank Dim. (in.) |
S: Simplex GPM* |
D: Duplex GPM* |
|
BT-0500-X |
500 |
400 |
52 x 81 |
0.83 |
1.67 |
|
BT-1000-X |
1000 |
800 |
64 x 98 |
1.67 |
3.33 |
|
BT-1490-X |
1490 |
1192 |
64 x 132 |
2.48 |
4.97 |
|
BT-2500-X |
2500 |
2000 |
90 x 111 |
4.17 |
8.33 |
|
BT-3000-X |
3000 |
2400 |
96 x 125 |
5.00 |
10.00 |
|
BT-4900-X |
4900 |
3920 |
102 x 159 |
10.17 |
20.33 |
*GPM based on one batch per 8 hour shift. The amount of batches able to be completed in 8 hours will depend on your process.